Details: sitc of overhead material handling system along with allied works at pump shop under a.e.w.w.(erc) office. sitc 0.5 ton wire/ chain hoist supply & installation monorail as per 0.5 ton hoist (9.1 mtr) supply fabricated structure as per 0.5 ton capacity hoist x 3 nos civil foundation as per relevant is standard with high tensile foundation bolt & template frame x 3 nos installation & commissioning live load testing & issuing form 11 with authorized competent person. fabricated gate frame with gate supply bus bar system
Sector: Municipality