Details: item no: 1 excavation for roadway in earth, soil of all sorts, sand, gravel orsoft murum including dressing section to the required grade,camber and side slopes and conveying the excavated materialswith all lifts upto a lead of 50 metre and spreading forembankment or stacking as directed. by mechanical means.119.00 ssr 2022-23 i/p 2.11/23 deduct 2.00% for labour aminities & cess (-2.00/100 119.00) * -2.38 add 10.00% for hilly/inacce. area 116.62 11.66add back 2.00% for labour aminities & (2.00/100 * 119.00) 2.38 cess 130.66 item no :2transportation charges for disposal of non-use or c waste material such as soil, earth, soft murum, building , excetra upto a specified distance / location, from site of work, complete. rate as per r. a. no. - 1 item no:3 providing, laying, spreading and compacting stone aggregatesof specific sizes to water bound macadar inciuding spreading inuniformbictrespecification thickness, hand packing to proper grade and camber applying and
Sector: Municipality