Details: manualy clearing the chockes/ rodding from under ground drainage line including inspection chambers with the help of required tools for propre functioning line chamber to chamber etc. complete. as per pwd ssr 2021-22it.no.46.54/pg.no.218 desilting the supply well, intake well/ head works, sump of water supply/ sewerage works etc. in wet or dry conditions including lifts upto 9m to lead upto 150m as required beyong the work site stacking, spreading, including necessary gurding etc. excavation for foundation / pipe line trenches in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material upto a distance 50 mtr. & lift as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc. complete. (bd-a-1/259) lift 0 to 1.50 m. mjp dsr page no.: 33 item no.: 1 excavation for foundation / pipe line trenches in hard murum and boulders, w.b.m. road including removing the excavated material upt
Sector: Municipality