Description: Steam and Water Analysis System for THDC Khurja 2x660 MW STPS TG package Scope of supply Steam and Water Analysis System SWAS Analysers Sample Handling System SHS for M s THDC Khurja 2x660 MW STPS TG package
Details: SHS Primary Rack (with Inconel-600 cooler coils) SHS Wet panel- Walkway through enclosed type SHS Dry Panel Chiller 2x100% Redundant - Min. 5 TR rating (with 25% extra capacity) - Common for both units SWAS Loose supply Items as per Annexure-A COMMISSIONING SPARES- Reagents /Calibrators/Standard solutions as required for commissioning & handing over of System to Owner. CONSUMABLES OTHER THAN CHEMICAL REAGENTS LIKE pH CELL , DO Sensors ETC. Freight charges for complete indigenous scope of supply upto project site Supervision & successful commissioning of SWAS in each unit of power plant CHEMICAL REAGENTS FOR 18 months continuous OPERATION of Analysers Optional item for Ordering - Price for one line of High Pressure & High Temp. - Primary & Secondary cooling to be considered along with other instruments as per P&ID applicable for the project. Optional item for Ordering -Price for one line of Low Pressure & Low Temp. - Secondary cooling to be considered along with ot
Sector: Power Sector