Description: Removall of silt in Kirugavalu tank RBC its minors under TBC
Details: Excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete.in dry condition. Complete with all lead and lifts & as directed by the Engineer-in-charge;Usage Charges of Machinery Hydraulic Excavator of 0.9 m3 bucket. Complete with all lead and lifts & as directed by the Engineer-in-charge;
Sector: Irrigation