Details: clearing thick jungle growth (less than 50 percent open space) including bushes upto upto 300 mm / parthenium and other weeds including burning or disposing off the same as directed etc.., complete with all leads and lifts loading and unloading charges as directed by the engineer in charge of the work.;cutting and burning of or disposing off apu/jondu from marshy areas as directed with all other ancillary operations etc.., complete with all leads and lifts loading and unloading charges as directed by the engineer in charge of the work.;excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations etc.., complete with all leads and lifts loading and unloading charges as directed by the engineer in charge of the work.;excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the sa
Sector: Irrigation