Details: earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. in all kinds of soils. depth upto 1.50m (csr vol-1, 2023-24 p.no-10, i no.1.17.1);providing s&s rcc spun / vibrated cast pipes (reinforced)pipes np-3 class conforming to is:458-1988 with latest amentmentsusing ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to lineand level including loading and unloading at both destinations and jointing of pipes and specials,
Sector: Municipality