Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. by mechanical means using dozer - in area of light jungle;filling -holes and patch repairs with bituminous concrete, 40mm (using vg-30 grade bitumen) - removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the holes with hot bituminous material as per clause 504 using hmp 40/60 tph capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2. ref to mort&h : irc - 3004.2;tack coat on bituminous surface - providing and applyi
Sector: Agri Marketing