Details: clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using cutter / minor equipment. complete with all lead and lifts and directed by the engineer in charge of the work;de-silting of feeder channel/canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of embankment or as directed including cost of all machinery, labour & all necessary works as directed and complete as per specification.complete with all lead and lifts and as directed by engineer incharge of the work.;excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete. complete with all lead and all lifts and as directed by the engineer incharge of the work.;
Sector: Irrigation