Details: scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by mechanical means using hydraulic excavator with in all lifts and lead (kpwd sr2023-24 sr v-3 it no.3.5 p.no 17);earth work excavation for pipeline trenches in all kinds of by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails and bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.all kinds of soils. depth upto 1.50 m ( csr-2023-24 v-1 i.no-1.17.1 p.no-10 );wet mix macadam (plant mix method) providing, laying, spreading and compacting graded stone aggregate to wet mix macadam sp
Sector: Municipality