Details: dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead dismantling stone masonry rubble stone masonry in cement mortar. (vol 3 item no. 2.10 iv b page no. 10);dismantling of flexible pavements dismantling of flexible pavements and disposal of dismantled materials and stacking serviceable and unserviceable materials separately by mechanical means bituminous course (vol 3 item no. 2.18 202 ii a page no. 12);dismantling of fencing dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back filling of pit by manual means including disposal of dismantled material with all lifts and lead, stacking serviceable material and unserviceable material separately. (vol 3 item no. 2.24
Sector: Municipality