Details: demolishing cement concrete manually/ by mechanical means including disposal of material to the appropriate disposal area as per direction of engineer-in-charge (item no:19.2.1, page no:187 , pwd sr vol- ii 2023-24);earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. (item no:1.17.1 page no:10, pwd sr vol-i 2023-24);providing, laying and jointing hdpe pipes of specified grade and conforming to is 4984-2016 with latest ammendments and conveying to work site including loading and unloa
Sector: Municipality