Description: Repair Rewinding and commissioning of 75HP and 180 HP non clog submersible pump at primary treatement plant Veerasagara and Repair Work in Gangasandra PTP city corporation tumkur limit
Details: Rewinding of 180HP Non-clog submersible motor: Removing power supply cable connections to the motor by removing motor terminal box meggering for testing of motor condition and then dismantling the motor at the well bed dissembling the motor removing the end connection of the starter winding taking out the wedges and coils, manufacturing of new coils by using new copper with F class insulation(timber glass covered enamel wire as per original specifications) HT insulation material like mica thermal mica flax hyperthermia terline tape rolls removing the old insulation of the removed coils as per the original specification. Re-winding the motor providing of new epoxy wedges to the slots providing new end connections and brazing by using silver brazing rods pre-heating for 12 hours in over impregnation and varnishing by using suitable vanish baking and Ovening of the winding. Assembling and testing and commissioning of the motor at the wet well at Tumkur(Rate Quoted after deducting the sa
Sector: Municipality