Details: rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and testing. for all types of submergible pumpsets etc.(with guarantee period not less than 6 months) forfor all types of submergible pumpsets upto 3.0 h.p pwd sr 2023-42 (vol-05p no 147 i no 13.1.1 );rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and testing. for all types of submergible pumpsets etc.(with guarantee period not less than 6 months) forfor all types of submergible pumpsets above 3 hp and upto 5.0 h.p. pwd sr 2023-24 (vol-05p no 147 i no.13 1.2);rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, eq
Sector: Municipality