Details: earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of bridges and such similar works, as per drawing and technical specifications, including setting out, shoring,strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. (p.w.d. v-1, s.r 2023-24. page no.5. item no.14.1) 242 +3 % av;providing and laying in position cement concrete for levelling course for all works in foundation. the granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant is codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, usage charges of ma
Sector: Municipality