Details: dewatering by mechanical means including hire charges of machinery,fuel and crew charges etc complete as per the direction of the engineer- in charge (statement of hire charges of machinery for the year. with all lead and lift, loading and unloading as per the directions of engineer in charge of work.10 hp diesel pump and as per directions of the engineer-in-charge;cutting and burning or disposing off apu / jondu from marshy areas as directed with all other ancillary operations complete. and as per directions of the engineer-in-charge.;earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces
Sector: Municipality