Details: demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of engineer-in-charge. (p-187/19.3)sr -2023-24 vol-02;providing speed breakers/raised pedestrian crossings in trapezoidal section with 2.5 m top width and transition length of 0.8 m length and height of 0.1 m as per irc 99:2018 using bituminous macadam (bm) gr ii and semi dense bituminous macadam (sdbc) gr ii for entire formation width & wbm grii for shoulder portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 nos. retro reflective traffic signs as per irc 67 -2022 irc99: 2018 two lane with formation width of 9.0 m;unskilled labour for unforseen works;
Sector: Transport Dept