Details: earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.. ordinary/soft rock (without requiring blasting) depth upto 1.50 m (common sor -2023-2024 volume - 1 ,page no: 10 , sor sl no: 1.17.1). 0-1.5 mts;refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. including cost of all labour complete as per specifications (common sor 2023-24, volume
Sector: Municipality