Details: supplying heavy gauge pvc conduit pipe ...... mm dia..........mm thick confirming to is 2509 with suitable size bends, metal/pvc junction boxes, adhesive paste etc., and running before concreting the slab. the conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using pvc end enclosures, run with 18swg gi fish wire wherever necessary[ pno-1, ino-1.2.1 of 2023-24 sr v-6];supplying heavy gauge pvc conduit pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing u or j hooks and cement plastering upto the wall surface and run with 18 swg g[ pno-1, ino-1.3.1 of 2023-24 sr v-6];supplying and fixing sheet metal box made out of 18 swg sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 75 x 75 x 65 mm[ pno-1, ino-1.4.1 of 2023-24 sr v-6];supplying and fix
Sector: Municipality