Description: Construction of Compound wall near TP office
Details: Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required required to complete the work PWD Common DSR 2023-24 Volume 1 (P No:9 I.No:1.16.1 );Construction of rock fill embankment with broken hard rock fragments of size not exceeding 300 mm laid in layers not exceeding 500 mm thick including filling of surface voids with stone spalls, blinding top layer with granular material, rolled with vibratory road roller, all complete as per clause 313.PWD Common DSR 2023-24 Volume 3 (P No:18 I.No:3.12);Providing and laying in position Cement Concrete for levelling
Sector: Municipality