Details: cutting asphalt /concrete road surface using machine cutter for leakage pit with earth work excavation in all classifications of soil including all lead and lifts bailing out water with pumps including barricading, danger lighting etc., as per requirement and disposing of the excavated stuff as directed. after attending the leak, refilling the trench for 30 cm depth quarry dust above and around pipelines and balance with available earth in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming including watering and consolidation by mechanical means approved by engineer incharge. (work to be carried out as per leak repair manual and the rate includes hire charges of dewatering pump, tractor, jeep with all kinds of labour in a complete manner). (water supply and ugd works common rates sr 2023-24 p.no.48/3.3);earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, c
Sector: Municipality