Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. by mechanical means using dozer in area of light jungle . (a) in area of light jungle;earth work excavation by manual means for drains, canals, waste weir, draft,approach channels, key trenches, foundation of buildings & bridges and suchsimillar works in all kinds of soils, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, removalof stumps and other deleterious matter, excavated surface leveled and sidesneatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost oflabour, tool
Sector: Municipality