Details: earthwork excavation for pipeline trenches (except building works) including depositing on bank upto a lead of 30 m including danger lighting and and using sight rails and boning rods at every 100 meters wherever necessary as directed in following strata etc., complete with all leads, lifts and labour as per the technical specifications, drawing and direction of the engineer-in-charge.;providing and applying two component coal tar epoxy based coating on inside surface of sewage effluent treatment tank 0.30 kg/m2 in 2 coats to achieve a dft of 200 microns when fully cured. ensure that this coating is applied over the protective plaster and that item no 4 is completed across the entire surface prior to applying the protective plaster. the waterproofing material shall have scratch resistance, for 7kg load as per astm d 7027 05, chemical resistance, immersion in dilute acid alkali & salt solutions 7 days confirms to astm c 868, salt spray resistance confirms to astm b 117. the finished cos
Sector: Municipality