Tender Title |
Construction of UGD From Prakash House to Gopal house, TCP Layout, ward No 12,3rd and 4th Cross,Head Master Layout,Ward No 20, Infront of Ramesh Cement Shop,Anekal Main Road, Near Sericulture office,S C Colony Old chandapura,From Subramani House to Surya Nagara Road, TMC Chandapura Limit |
Tender Description |
earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.in all kinds of soils depth upto 3 m (page no.8, item no.1.14,pwd sr 2023-24);supplying, lowering, laying, jointing, testing and commissioning of glazed stone ware pipes of following dia, conforming to is 651:1992, is 4127 with latest amendments, including conveying to work site, caulking with dipped in tar and jointing with cm 1:1.5 using opc, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per technical specifications. the cost to include the cost of all j |
Comments |
earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.in all kinds of soils depth upto 3 m (page no.8, item no.1.14,pwd sr 2023-24);supplying, lowering, laying, jointing, testing and commissioning of glazed stone ware pipes of following dia, conforming to is 651:1992, is 4127 with latest amendments, including conveying to work site, caulking with dipped in tar and jointing with cm 1:1.5 using opc, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per technical specifications. the cost to include the cost of all j |