Details: civil works general note:a) before commencement of plastering, the area shall be cleaned, wetted and shall be marked with 'thiyyas' or 'tapanis' and shall be got approved by the engineer-in-charge.b) whenever the electrical contractor/ agency has to fix up switch boxes in walls, necessary thiyyas or 'dhadas' shall be arranged prior to plastering so that the electrical boxes are fixed properly in line with the finished plastered surfaces.c) finishing around the junction boxes shall be done at all floor, level and position to the line, level and right angles as required while carrying out plastering work.d) no extra claim for consumption of plastering material shall be entertained by the department for the plastering done more than the specified thickness shown in the schedule of quantities, to bring the plastered surface to perfect line, level and plumb with adjoining columns and beams.e) only ready mix mortar of approved make shall be used.
Sector: Power Sector