Details: dismantling of existing pump and motor and shifting of the pump and motor to the harihar cmc's wtp complete the work as per the directions of the engineer-in-charge of the work.;supply, errection and commissioning of vt pump and motor set of 125 hp, 95kw, 4 pole, lt motor, site brand new approved make oil lubricated deep well turbine pump sets coupled to 3phase , 50 cycles, 440 volts spdp vertical solid shaft squirrel cage induction motot along with motor stool, column assembly, bowl assembly and strainer, ss fasteners etc complete, conforming to is 1710 capable of discharging 160.7 lps of againest a total head of 40 mtr.with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete the work as per the directions of the engineer-in-charge of the work;supply, errection and commissioning of 90kw/125hp vfd starter panel, with necessory panel box which suitable for commissioning of 125hp vt pump and motor with all lead, lifts, loa
Sector: Municipality