Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness (by mechanical means using dozer in area of light jungle) complete with all lead and lift as per the direction of engineer incharge of the work.;excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete with all lead and lift as per the direction of engineer incharge of the work ( in dry condtion);hiring charges of hiring tractor trolley for removal of debris and silt in slussy condition in village limits complete with all lead and lift as per the direction of engineer
Sector: Irrigation