Details: earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out,construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. (item no1.17.1, page no.10, v1 p.w.d.c s.r. 2023-24 );providing and laying in position plain cement concrete for levelling course for all works in foundation. the granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant is codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, usage
Sector: Municipality