Details: part-a sunken slabs & chambers:earthwork excavation in all sorts of soil for foundation of trenches, walls, drains, plinths and for all other miscellaneous foundation works etc. upto an average depth of 1.50 meters [from the existing ground level] including cutting / removing & clearance of jungle; bushes, grass & all other unwanted plants / creepers, shoring; strutting; bailing out water [if necessary]; preparation of base, refilling the sides of the foundation with excavated available good quality soil; leveling / dressing & hand ramming with proper watering, providing; fixing & removing necessary staging / platform / ladder [if required], cleaning the work area, colleting & stacking the generated waste / dead debris & surplus soil up to a lead of 50 meters from the place of work etc. complete all as per standard technical specifications and as directed by engineer-in-charge at all locations & all lifts. providing and laying pcc 1:2:4 using 20 mm & downsize, (for chamber ) clean, cru
Sector: Generation