Details: clearance of slip in earth & boulders including all leads and lift as directed by engineer in charge. including supply of all material, labour,t&p etc required for proper completion of work excavation in foundation in all type of soil including upto lift 1.5m & lead upto 30m & including filling watering & rammering of excavated earth into the trenches or into the space between the sides of foundation trenches or into the plinth & removal & disposal & surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. random rubble masonary laid dry in wall,retaining wall, arapets,scupper etc. including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(as per pwd uttarakhand specifica
Sector: Road development