Description: NDB BRRP2 150 MUZAFFARPUR EAST 1 Name of Work MMGSY AWSESH NDB BRRP2 150 MUZAFFARPUR EAST 1
Details: Kerma Padmaul Path to Paswan tola -Setting out(i) Construction of Reference & Working Benchmark = 1 Nos. & 2 Nos. RespectivelySOR Item No.-1.16 (ii) Construction of Reference Pillars/Burjees = 20 NosSOR Item No.-1.16 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.SOR Item No.-2.2 Excavation for roadway in soil using manual means for carrying of out earth to embankment site with a lift up to 1.5 m and lead up to 50m as per Technical Specification Clause 302.3.SOR Item No.-3.5 (I) Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation co
Sector: Road development