Description: Periodical Renewal of 5 year completed post DLP PMGSY a L045 Manduki to Olara Road b L 47 to Ratanpur for the year 2023 24 under Package No PM NIMAPARA 08 Name of Work Periodical Renewal of 5 year completed post DLP PMGSY a L045 Manduki to Olara Road b L 47 to Ratanpur for the year 2023 24 under Package No PM NIMAPARA 08
Details: Initial Rehabilitation Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 & as per direction of the Engineer-in-Charge. a) L045-Manduki to Olara Road b) L 47 to Ratanpur Providing and laying for scraping, cleaning the road surface applying tack coat using 3.0 kg of bitumen for 10 sqm and laying 75mm thick built up spray grouting in two layers 37.5mm thick each layer using 0.45 cum of 25mm to 40mm size crusher broken hard granite material and 12.00 Kg penetration grade of bitumen for 10 sqm in each layer with 0.12cum of 12mm size hard granite chips as key stone for 10sqm spreading over and laying in
Sector: Road development