Description: MMGSY NDB BRRP 618 BARH Name of Work MMGSY NDB BRRP 618 Barh
Details: Name of Work: PURA NAIYA BIGHA ROAD TO SAMUDAYAK BHAWAN HARAULI LENGTH - 0.610M BLOCK - BELCHHIPAVEMENT WORKSetting Out work complete with construction of bench mark (Min 1 per km) working benchmark (Min 4 per km) and near all bridges and cross-drainage works made of bricks/stone masonary or concrete and reference pillars made of precast concrete poles/concrete filled 100 mm dia A.C.pipe @ 100 m interval of as required on both sides of the formation width, marking on central line, setting out curves and recording of central line levels and other required levels and distances etc. including setting out of cross-drainage structures & bridges with required reference pillars and marking etc. as directed by Engineer-in-Charge. Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. (i) Excavation in Soil using Hydraulic Excavator and Tippers with disposal upt
Sector: Road development