Description: CERTAIN REPAIRS REPLACEMENT TO LT DISTRIBUTION CABLES LIGHTENING PROTECTION EARTHING PITS AND LT DISTRIBUTION SYSTEM OH LINES WITH CONNECTED ITEMS INCLUDING REPAIR MAINTENANCE OF FIRE FIGHTING INSTALLATION AND CONNECTED WORKS IN TECHNICAL AREA AND Name of Work CERTAIN REPAIRS REPLACEMENT TO LT DISTRIBUTION CABLES LIGHTENING PROTECTION EARTHING PITS AND LT DISTRIBUTION SYSTEM OH LINES WITH CONNECTED ITEMS INCLUDING REPAIR MAINTENANCE OF FIRE FIGHTING INSTALLATION AND CONNECTED WORKS IN TECHNICAL AREA AND DOMESTIC AREA AT 21 WING AF STATION LEH UNDER GE AF LEH
Details: Excavation in trenches not exc 1.5m wide and and not exc. 1.5m depth wide in any type of soil for laying electric cables/pipes etc including getting out excavated earth and trimming the sides and bottoms of trenches , complete all as specificed and directed by Engineer-in-Charge. Returning, filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25cm thick each, excavated soil in trenches after the cables have been laid and tested, complete all as specified and directed by Engineer-in-Charge. Removing excavated soil to a distance not exceeding 50 meter and depositing where directed at a level not exceeding 1.50 meter above the starting point , complete all as specified and directed by Engineer-in-Charge. Sand cushioning to under ground cable with clean dry sand locally available with layer of sand 8cm thick before laying of cable and 15 cm after laying of cable, complete all as specified and directed by Engineer-in-Charge.Note- For payment purp
Sector: Defense