Details: formation cutting & setting out works clearing and grubbing of road land including uprooting wild vegetation, grass, brushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per technical specification clause 201. cutting of trees including cutting of trunks,branches and removal of stumps and root, refilling, compaction of backfilling and stacking of serviceable materials by manual means with all lifts as per technical specification clause 201(a) lead upto 100m.(i) girth above 300mm to 600mm. (ii) girth above 600mm to 900mm. (iii) girth above 900mm to 1800mm. construction of reference pillar as per fig 1600.1 (b) as per drawing and technical specification clause 1602.1 construction of back pillar as per fig 1600.1 (c) as per drawing
Sector: Road development