Description: Earthen Shoulder GSB WBM III BT CDs etc Name of Work L025 Road from PMGSY Road Staging Hut Krosam to Khrawit
Details: SH- Setting Out Construction of Bench Mark, Working Benchmark as per drawing and specification. 1.00 KM reference bench mark and working bench mark. Providing and fitting fixing of bamboo (1st class) 85mm to 100 mm dia 2.00 m long including driving the pegs up to 60 cm depth and marking with paint, sharpening the bottom maintaining the lines etc complete. Reference pillar SH-Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material By Manual Means (In area of non-thorny jungle) Excavation in Hilly Areas in Soil by mechanical means Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 Excavation
Sector: Road development