Details: schedule 'a' e/m items material & labour for dehydration/filteration of tranformer oil at site by means of centrifuging machine in order to improve di-electric strength of oil as per is-355. break down voltage should not be less than 50 kv, complete all as specified & directed by engineer-in-charge. material & labour transformer oil having di-electric strength of 60 kv as per is complete for top up/ replacement, complete all as specified & directed by engineer-in-charge. note: (i) oil shall be filled in the transformers/stabilizers to be repaired or installed at site at different locations.(ii) oil should be supplied in sealed barrel of power/transol brand material and labour for painting of the tranformer 315 kva complete by removing old paint by scrapping and providing spray painting with synthetic enamel paint of approved make duly marking/writing mes/sm no., complete all as specified & directed by engineer-in-charge. supply only gasket for lt/ht bush suitable for 400 kva transfor
Sector: Defense