Description: Upgradation of various roads in Block Sunam and Malerkotla II under PMGSY III Batch III with FDR Technology Name of Work Upgradation of Various roads in Block Sunam Malerkotla II UNDER PMGSY III BATCH III with FDR Technology
Details: UPGRADATION OF Dirba to Nagra via Gujjran Road PB-17311 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. Dismantling of flexible and granular pavements and Spreading in the
Sector: Road development