Details: setting out pillars providing & fixing of working benchmark pillars 2 nos. per km & 6 nos. of reference pillars required for 1 km. as per drawings given and direction of e/i clearing and grubbing road land (by manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of e/i box cuttingexcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an ave
Sector: Road development