Details: part-i (initial rehabilitation) clearing grass and removal of on both sides of the road to facilitate widening of berms, disposal of the stuff including all labour, t&p articles required for the work etc.complete as per clause 201 of mord. as per direction of engineer in charge. road- a road - b scarifying the existing bituminious surface for finished item of work with hire & running including cost and conveyance of all materials and labour etc complete and as per direction of engineer-in-charge road-a road - b flank dressing to proper camber including cost of labour ,t&p etc. complete as per direction of the engineer-in-charge. road-a road - b reworking or rerolling the scarified bituminous surface suitably after supplementing the base materials with quarry dust and compacting finished surface as per direction of the engineer-in-charge. road-a road - b providing granular sub-base using sand,gravel or moorun of approved quality from approved quarry with cost conveyance, royalty,
Sector: Road development