Details: periodic renewal and 5 year routine maintenance of l036 - kumaragudi chinnavanagiri road km 0/0 - 2/990 in package no. tn 09-204r in sembanarkoil block of mayiladuthurai district clearing the light jungle including all labour charges for burrying and burning etc., complete. collection and supply of us gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete, km 0/0 - 1/0 km 1/0 - 1/750 advance patch work for making up the undulation in the existing b.t surface to an average thickness of of 50mm using 45mm irc size hbg metal km 0/0 - 1/0 km 0/0 - 1/750 providing and laying tack coat over the bt surface using 2.50 kg of bituminous emulsion for 10 sqm. including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying
Sector: Road development