Details: part-i (initial rehabilitation) clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of grith upto 300mm removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means andstacking of serviceable materials to be used or auctioned upto a lead of 1000m incuding removal and disposal of top organic soil not exceeding 150mm in thickness etc. complete as per direction of engineer-in-charge. road-a road-b providing 37.5mm thick built up spray grouting after scrapping, cleaning the road surface applying tack coat using 3.00kg of bitumen for 10sqm and laying of one layer of 37.5mm thick by using 0.45cum of 25mm to 40mm grade bitumin for 10 sqm in each layer with 0.12 of 12mm size b.h.g. c.b chips as key stone for 10 sqm.spreading over and laying induding heating pouring, spreading bitumirl metal and chips and compacting with p.r.r including cost ,conveyance royalty taxes of all required metterials,hi
Sector: Road development