Description: Construction of High Level Bridge 2x15m Over UBDC falling on Mehta Shri Hargobindpur road to Bolewal via Talwandi at RD 3750 Mtr in District Gurdaspur under scheme PMGSY Phase III Batch III Name of Work CONSTRUCTION OF HIGH LEVEL BRIDGE 2 SPAN 15 00 EACH ON MEHTA SHRI HARGOBIND ROAD TO BOLEWAL VIA TALWANDI INCLUDING APPROACHES IN DISTT GURDASPUR
Details: Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Clause 304 a) up to 3 mtr. Depth b) up to 6 mtr. Depth Reinforced Cement Concrete M-35 in Piles including Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV) ( 2 Nos ) excluding steel reinforcement complete as per Drawing and Technical Specification.MORT&H Clause 1100 & 1700 Providing and laying of PCC M15 levelling course below the pile cap.complete as per drawings and technical specifications Clause 1100&1700 Reinforced Concrete M 30 in Pile Cap including centering shutering but excluding steel complete as perDrawing and Technical Specifications section 1200,1500 & 1700. Reinforced cement concrete M 30 grade Mechanical Mixed and v
Sector: Road development