Details: bhabnauli road to gadhi setting out pillars providing & fixing of working benchmark pillars 2 nos. per km & 6 nos. of reference pillars required for 1 km. as per drawings given and direction of e/i clearing and grubbing road land (by manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of e/i box cuttingexcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures a
Sector: Road development