Details: foundation excavation for structures earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. ordinary soil i) upto 3m depth providing and constructing temporary earth island (assuming depth of water 1.0 m and height of island to be 1.25 m including royality for earth @ rs. 5526.00 for each island.) providing and constructing one span service road to reach island location from one pier location to another pier location including royality for earth @ rs. 225.00 per m for service road. bored cast-in-situ m35 grade r.c.c. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. ii. 1200 mm dia (using batching plant, trans
Sector: Road development