Details: t02-t03 ibrahimpur via bhartau, unthu fal, parsi, li setting out pillars :- providing & fixing of working benchmark pillars 01 nos. per km & 04 nos. of reference pillars required for 1 km. as per drawings given and direction of e/i clearing and grubbing road landclearing and grubbing road land ( by manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of e/i ( by manual means) in area of non-thorny jungle scrarifying existing bituminous surface to a depth of 50 mm and disposal disposal of scrarified materials with a lift upto 3m and lead upto 1000m as per technical specification clause 301.4 construction of embankmen
Sector: Road development