Description: construction of RCC Post With BARBED Wire Fencing for New allotted Land at Samba jammu and Kashmir Name of Work CONSTRUCTION OF RCC POST WITH BARBED WIRE FENCING FOR NEW ALLOTTED LAND AT SAMBA J K
Details: Excavating holes more than 0.10 & upto 0.5 including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. All kinds of soil Providing and laying in position cement concrete1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size of specified grade excluding the cost of centering and shuttering - All work up to plinth level Only supply at site R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarses and : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in charge (cost of earth works in excavation, concrete works in foundation to be paid separately). (Hight of RCC post -2.15 mt) Fencing with R.C.C. post pla
Sector: Police and Internal Security