Description: RRSMP 25 26 Navgachia 05 Name of Work RRSMP 25 26 Navgachia 05 Name of Work RRSMP 25 26 Navgachia 05 Name of Work RRSMP 25 26 Navgachia 05
Details: L021 PMGSY ROAD SAHABBAD TO ATHGAMMA TRACK 3 Clearing and Grubbing Road Land (By manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of E/I Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. Construction of subgrade and earthen shoulders :-Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of Table 300.2 with lead upto 1000 m as
Sector: Road development