Details: cleaning grass and removal of up to a distance of 30m outside the periphery of the area as per technical specification clause 201 excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lift and lead as per technical specification clause 302.3 construction of embankment with approved materials deposited at site from raodway cutting and excavation from drain and foundation of other structures graded and compacting with vibratory roller to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading , grading to required and compacting to meet requirement of tables 300.1 and 300.2 with all lead & lift as pe
Sector: Road development