Details: part-i (initial rehabilitation) clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of grith upto 300mm removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means andstacking of serviceable materials to be used or auctioned upto a lead of 1000m incuding removal and disposal of top organic soil not exceeding 150mm in thickness as per direction of engineer-in-charge. scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified materials with in all lifts and lead upto 1000 metres etc.complete. excavation for road work in soil with hydraulic excavator of 0.9cum bucket capacity including cutting and loading in tippers,trimming bottom and side slopes,in accordance with requirements of lines,grades and cross-sections and transporting to the embankment location with a lift up to 1.5m and lead upto 1000m as per technical specification clause 302.3. filling in foun
Sector: Road development